Public Projects

Asl Taranto

PO MARTINA FRANCA

ENERGY EFFICIENCY

Read Job Description

Design of energy efficiency interventions of the “Valle d’Itria” Hospital in Martina Franca (TA) – “INTERVENTIONS FOR THE ENERGY EFFICIENCY OF PUBLIC BUILDINGS” – Puglia Regional Operational Program 2014-2020. Priority Axis IV Specific objective: AR 4.1.

For the service in question, the following interventions for the energy requalification of the Building-Plant system have been envisaged, with particular regard to environmental sustainability through the application of the L.R. 13/2008, “Protocol Itaca Puglia 2017 – Non-residential buildings”:

 

  • Thermal insulation of the walls;
  • Thermal insulation from the outside of the roof slab;
  • Partial replacement of fixtures;
  • Installation of a photovoltaic system for self-consumption of 100 kWp;
  • Installation of a photovoltaic system for self-consumption of 100 kWp;

Year: 2017
Cost of the works: 3,272,000 euros
Location: Martina Franca (TA)
Client: Taranto Local Health Authority

Role: Technical-economic feasibility design, Energy Diagnosis drafting, APE, Final Design, Safety Coordination in the Design phase (CSP)

 

Energy requalification

Floor insulation and construction details

Photovoltaic system

PO MARTINA FRANCA

FIRE PROJECT

Read Job Description

Fire prevention design, 1st year SCIA drafting, Final and Executive Design for adaptation work to the fire regulations of the “Valle D’Itria” Hospital of Martina Franca (TA).

The planned interventions are:

  • Realization of new masonry packages and fireproof ceilings;
  • Plating, with materials and products of suitable Fire Resistance Class of existing walls and floors;
  • Replacement of existing fixtures, both external and internal;
  • Replacement of existing REI windows, both external and internal;
  • Realization of n. 5 New External Safety Stairs;
  • Construction of a new fire-fighting tank;
  • Burial of diesel fuel tanks for emergency generator sets;
  • Construction of a new Fire Detection System;
  • Adaptation of the fire-fighting water network;

 

Year: 2016 – 2019

Amountof work: € 3,320,700.00

Locality: Martina Franca (TA)

Client: Local Health Authority – Taranto

General planimetry

Plant project plan

Staircase structural project

PO MOSCATI

ENERGY EFFICIENCY

Read Job Description

Design of energy efficiency interventions of the “G. Moscati “of Statte (TA) -” INTERVENTIONS FOR THE ENERGY EFFICIENCY OF PUBLIC BUILDINGS “- Puglia Regional Operational Program 2014-2020. Priority Axis IV Specific objective: AR 4.1.

For the service in question, the following interventions for the energy requalification of the Building-Plant system have been envisaged, with particular regard to environmental sustainability through the application of the L.R. 13/2008, “Protocol Itaca Puglia 2017 – Non-residential buildings”:

 

  • Thermal insulation of the walls;
  • Thermal insulation from the outside of the roof slab;
  • Replacement of fixtures;
  • Installation of an air conditioning system equipped with gas electric heat pumps (VRF);
  • Installation of a photovoltaic system for self-consumption of 159 kWp;
  • Installation of a supervision, management control and consumption monitoring system.

Year: 2017
Costof the works: 4,995,000 euros
Locality: Statte (TA)
Client: Taranto Local Health Authority

Role: Technical-economic feasibility design, Energy Diagnosis drafting, APE, Final Design, Safety Coordination in the Design phase (CSP)

 

General plant plan

Vertical Wall Requalification

Plant Project

Construction details

PO MOTTOLA

STRUCTURE ADJUSTMENT

Read Job Description

Extract project for the placement of Psychiatric Assisted Rehabilitation Community (C.R.A.P.) and Territorial Center for Autism (C.A.T.) on the First Floor of the Ex P.O. of Mottola.

The works planned for the intervention are presented below:

  • Remodeling of the existing spaces to adapt the First Floor to the location of C.A.T. and C.R.A.P .;
  • Realization of fireproof masonry packages and / or facing of existing walls;
  • Installation of new fire-resistant ceilings and / or plating of existing floors;
  • Replacement of existing floors and walls;
  • Revision and / or replacement of tegliafuoco doors;
  • Furnishings;
  • New electrical system, data network and TV;
  • Replacement of existing lamps with new LED lighting bodies;
  • New Fire Detection System;
  • Adaptation of air conditioning and fire-fighting water network systems to the new architectural configuration.

Year: 2019

Amount of work: € 1.400.00.00

Locality: Mottola (TA)

Client: Local Health Authority – Taranto

Role: Technical-economic feasibility project, Final Project, Executive project, Safety Coordinator in the Design phase (CSP).

 

Distribution Scheme C.A.T. and C.R.A.P

Suspended ceilings plan

Air conditioning system plan

Fire-fighting system plan

Hospital agency
s. maria di terni

Municipality of molfetta

HOSPITAL

ENERGY DIAGNOSIS

Read Job Description

Drafting of DIAGNOSIS AND ENERGY CERTIFICATIONS on public buildings aimed at promoting energy efficiency interventions – POR-FESR 2014-2020 “.

“HOSPITAL” BUILDING;

BUILDING A1 “DEU, OPERATING PLATE”;

BUILDING B “UNIVERSITY, CANTEEN, CONFERENCE ROOM, ADMINISTRATIVE OFFICES, POLYAMBULATORS”;

BUILDING C “NEUROPHYSIOPATHOLOGY”;

BUILDING D “HOSPITAL”;

BUILDING D1 “HOSPITAL”;

BUILDING AND “OBITORIO, MEDICAL PATHOLOGY LABORATORY, LEGAL MEDICINE, SER.T.”

 

Year: 2016

Amount of work: € 14.601.553,60

Location: Terni

Client: “S. MARIA ”of Terni

Role: Drafting of Energy Diagnosis, Energy Performance Certifications (APE) and Technical calculation reports (D. Intermin. 26/06/2016 ex L. 09/01/1991 n.10)

General planimetry

HOSPITAL

SDIF RELAMPING

Read Job Description

“Relamping” project, i.e. replacement of all existing lighting bodies with higher efficiency LED lamps in buildings B, C, D, D1, E of the “S. MARIA ”of Terni.

Year: 2016

Cost of the works: € 461.734,00

Cost of the works: € 461.734,00

Client: “S. MARIA ”of Terni

Role: Executive Design

 

Building B

Building C

Building C

Building D!

Building E

SCHOOL DE AMICIS

SEISMIC ADJUSTMENT

Read Job Description

Safety measures and redevelopment of public buildings used for school use – “E. De Amicis ”of Molfetta (BA) – NATIONAL OPERATIONAL PROGRAM“ FOR THE SCHOOL ”2014-2020, PRIORITY AXIS II, SPECIFIC OBJECTIVE 10.7.

The interventions proposed and designed for the service in question are:

  • Seismic adaptation and improvement interventions (Building and structural works aimed at seismic adaptation);
  • Plant upgrading interventions (Ex novo construction of electrical system, water-sewage system and heating system)
  • Energy efficiency interventions (Thermal insulation of the floor slab and vertical walls, Replacement of fixtures, Enhancement of photovoltaic system, Installation of heat pump water heaters for DHW production, Replacement of existing lighting bodies with LED lamps, Installation of a new generator heat consisting of condensing boiler)
  • Green arrangement and redevelopment of the appurtenant external areas

Year: 2018
Cost of the works: 1,282,000 euros
Locality: Molfetta (BA)
Client: Municipality of Molfetta (BA)

Roleplayed: Definitive Project

 

Enclosure requalification and external arrangement

Vulnerability Analysis

Project carpentry

PASCOLI SCHOOL

ENERGY EFFICIENCY

Read Job Description

Technical-economic feasibility design, drafting of Energy Diagnosis, APE, Final Design, Executive Design, Safety Coordination in the Design phase for the energy efficiency works of the “G.Pascoli” Middle School of Molfetta (BA) – “INTERVENTIONS FOR THE ENERGY EFFICIENCY OF PUBLIC BUILDINGS “- Puglia Regional Operational Program 2014-2020. Priority Axis IV Specific objective: AR 4.1.

For the service in question, the following interventions for the energy requalification of the Building-Plant system have been envisaged, with particular regard to environmental sustainability through the application of the L.R. 13/2008, “Protocol Itaca Puglia 2017 – Non-residential buildings”:

  • Thermal insulation of the roof slab;
  • Replacement of fixtures;
  • Replacement of existing heat generators with condensing boilers powered by methane gas;
  • Installation of thermostatic valves on all radiant elements and insulation of the pipes of the heat distribution system;
  • Installation of a photovoltaic system;
  • Replacement of electric boilers with heat pumps for DHW;
  • Replacement of existing lamps with LED lamps;

Year: 2017
Cost of the works: 1,386,000 euros
Locality: Molfetta (BA)
Client: Municipality of Molfetta (BA)

 

Roof Plan - Details

First Floor - Identification of interventions

Prospectuses Sections

chamber of commerce foggia

Read Job Description

 

ENERGY DIAGNOSIS SERVICES RELATING TO BUILDINGS INCLUDED IN THE IMPLEMENTATION OF THE INVESTMENT PROGRAM CALLED “Project U.E.F.A. (EUROPEAN UNION ELENA FOGGIA FACILITY ASSISTANCE) “- LOT n. 1

Year: 2019

Amount of work: 4,094,287.08 euros

Location: Province of Foggia (FG)

Client: Chamber of Commerce of Foggia (FG)

Role: Drafting of energy diagnosis of n. 48 buildings used for public use in the Province of Foggia (FG)

Municipality of Atella

Read Job Description

Project Financing for the assignment under concession of the management, ordinary, scheduled and extraordinary maintenance of the public lighting systems of the Municipality of Atella (PZ), including the supply of electricity and the design and execution of adaptation, reconstruction, redevelopment and energy efficiency of the plants. The intervention involved the Municipality of Atella and its hamlets: Montesirico, Sant’Andrea, Sant’Ilario, Monticchio Lakes.

The interventions proposed and subject of this design service are related to:

 

  • Replacement of the existing “lighting park” with new higher efficiency LED lamps;
  • Adaptation to current regulations in the sector and / or replacement of electrical panels;
  • Replacement of damaged support poles;
  • Burial of overhead electrical cables.

 

 

Year: 2019
Cost of the works: 1,342,000.00 Euros
Locality: Atella (PZ)
Proposing party: CB H.T.L. S.r.l. – Atella (PZ)
Role performed: Designer on behalf of the Proposing Subject – CB H.T.L. S.r.l. – Project Financing

 

General planimetry

Municipality of Mottola

Read Job Description

Realization of the public video surveillance system of the Municipality of Mottola – “ARGO PANOPTES” – legality and safety (PON Security: ERDF National Operational Program “Security for Development” ERDF Convergence Objective 2007/2013).

 

Year: 2013
Total amount: € 229.990,00
Cost of the works: € 173.536,00
Locality: Mottola (TA)
Client: Municipality of Mottola (TA)
Role: Final and Executive Design, Works Manager

 

General planimetry

System Architecture

Operations center

Construction details

Municipality of Laterza

Read Job Description

Energy efficiency works in public lighting through interventions aimed at modernization and adaptation, energy saving, compliance with safety standards and the containment of light pollution through the use of third-party financing – MUNICIPALITY OF LATERZA (TA).

The interventions proposed and subject of this design service are related to:

  • Replacement of the existing “lighting park” with new higher efficiency LED lamps;
  • Adaptation to current regulations in the sector and / or replacement of electrical panels;
  • Replacement of damaged support poles;
  • Burial of overhead electrical cables.
  • Smartcity services such as: public video surveillance, remote management system of the lighting park, SOS columns, etc …

 

Year: 2016 – 2019
Cost of the works: € 2,250,000.00
Locality: Laterza (TA)
Clients: Municipality of Laterza;
Role: Technical-Economic Feasibility Study; Execution Phase Safety Coordinator (CSE)

 

Electric lines

Calculations Criticality adjustment

Interventions for artistic decoration

Interventions for Monuments Enhancement

Municipality of Palizzi

Read Job Description

Project Financing for the granting of the concession relating to the management, ordinary, scheduled and extraordinary maintenance of the public lighting systems of the Municipality of Palizzi (RC), including the supply of electricity, the design and execution of adaptation, renovation, redevelopment interventions and energy efficiency of the plants. The intervention involved the Municipality of Palizzi Centro and its hamlets: Palizzi Marina, Pietrapennata, Spropoli.

The interventions proposed and subject of this design service are related to:

  • Replacement of the existing “lighting park” with new higher efficiency LED lamps;
  • Adaptation to current regulations in the sector and / or replacement of electrical panels;
  • Replacement of damaged support poles;
  • Burial of overhead electrical cables.

 

Year: 2018
Cost of the works: 1,400,000 Euros
Locality: Palizzi (RC)
Soggetto Proponente: LM IMPIANTI srl – Altamura (BA)

Role: Designer on behalf of the Proponent LM IMPIANTI srl – Project Financing

 

 

General planimetry

General plan of the hamlets

Municipality of Bitetto

Read Job Description

Assignment in concession with financing through third parties (FTT) of the integrated public lighting service: Design and execution of regulatory compliance works, safety measures, reduction of light pollution, energy efficiency, maintenance, including the supply of electricity “.

The interventions proposed and subject of this design service are related to:

  • Replacement of the existing “lighting park” with new higher efficiency LED lamps;
  • Adaptation to current regulations in the sector and / or replacement of electrical panels;
  • Replacement of damaged support poles;
  • Burying of overhead electrical cables;
  • Smart city services such as public video surveillance, timely management system of individual lighting bodies, etc.

 

Year: 2015
Cost of the works: € 1,629,485.88
Locality: Bitetto (BA)
Client: Municipality of Bitetto (BA)
Role: Final Design, Executive Design, Safety Coordinator under construction (CSE)

 

 

General planimetry

Intervention Area Panel A

Intervention Area Panel B

System Architecture

Municipality of Bitetto

Read Job Description

Technical-economic feasibility design, drafting of Energy Diagnosis, APE, Final Design, Executive Design, Safety Coordination in the Design phase for the energy efficiency works of the Elementary School “Cianciotta” in Bitetto (BA) – “INTERVENTIONS FOR THE ENERGY EFFICIENCY OF PUBLIC BUILDINGS “- Puglia Regional Operational Program 2014-2020. Priority Axis IV Specific objective: AR 4.1.

For the service in question, the following interventions for the energy requalification of the Building-Plant system have been envisaged, with particular regard to environmental sustainability through the application of the L.R. 13/2008, “Protocol Itaca Puglia 2017 – Non-residential buildings”:

  • Thermal insulation of the roof slab;
  • Replacement of fixtures;
  • Replacement of existing heat generators with a hybrid system of electric heat pumps and condensing boilers powered by methane gas;
  • Installation of thermostatic valves on all radiant elements;
  • Installation of a photovoltaic system;
  • Replacement of electric boilers with heat pumps for DHW;

Year: 2017
Cost of the works: 1,060,000 euros
Locality: Bitetto (BA)
Client: Municipality of Bitetto (BA)

 

Prospectuses Sections

Floor insulation

Photovoltaic system

Replacement Fixtures

info@studiotodo.it
via Buonarroti 45\B, 74014 Laterza (TA)

(+39) 099.8216336

Certification

2020 © To Do Engineering and all rights reserved | VAT number IT02785540739

Project by

Pin It on Pinterest

Share This